Home / Event / Project Completion Management… Project Completion Management System (PCMS)

Project Completion Management System (PCMS)

Training ini membahas alur Mechanical Completion, Commissioning, hingga System Handover, mencakup systemization, ITR, punch list, readiness, dan STP untuk memastikan proses completion proyek berjalan terstruktur dan efektif.

Tanggal
16 May 2026
Jam
13:00 - 12:00 WIB
Lokasi / Format
Online Zoom
Investasi
Rp 1.500.000
Rp 2.500.000
Pendaftaran
Sesi
2x Pertemuan
Project Completion Management System (PCMS)

Training Project Completion Management System (Mechanical Completion, Commissioning & System Handover) dirancang untuk memberikan pemahaman menyeluruh tentang alur penyelesaian proyek dari tahap konstruksi hingga serah terima ke operator. Peserta akan mempelajari konsep systemization, pengelolaan ITR dan punch list, readiness commissioning, serta penyusunan System Turnover Package (STP).

Training ini bersifat praktis dan berbasis studi kasus proyek EPC Oil & Gas, Power Plant, dan industri, sehingga peserta mampu mengelola proses completion secara terstruktur, terukur, dan siap diaudit

Kelas ini cocok untuk siapa?
Kelas ini sangat cocok di ikuti oleh seorang Field engineer/supervisor, QA/QC, Construction, Pre-commissioning / Commissioning engineer, Planner/Project Control, Document Control / Admin, Subcontractor coordinator, maupun fresh graduate yang ingin paham alur project completion & handover.


Learning Outcomes 

Setelah training, peserta mampu:

  • Memahami workflow Completion dari Construction, MC, Pre-Comm/Comm, Handover.
  • Menyusun struktur System/Sub-system dan batasan handover (boundary).
  • Mengelola ITR/Checklist/Test Record, punch list (A/B/C), dan status readiness.
  • Menjalankan konsep System Turnover Package (STP) dan Handover Dossier.
  • Membaca dan membuat progress measurement completion yang rapi (dashboard/reporting).

Info & Pendaftaran 

http://lynk.id/bontistudio/30xr1zrwxwp0
Atau hubungi WA Admin: 085607714585
Investasi  : Rp. 2.500.000,
Harga Special Hari ini : Rp. 1.500.000 

Metode Trainng  :  Zoom online


 

Pemateri : I Putu S.

  • Commissioning Engineer berpengalaman lebih dari 10 tahun di proyek Oil & Gas, Petrochemical, dan Power Plant, dengan keahlian dalam pre-commissioning, mechanical completion, dan system handover.
    Profile : https://www.linkedin.com/in/i-putu-s-3ba49b36/

Facilities :

  • E-Certificate of Attendance
  • Materi PPT & contoh dokumen proyek nyata (form ITR, checklist, flow diagram, Precomm-Com Procedure)
  • Sesi tanya jawab langsung
  • Video Recording
  • Diskon 50% aplikasi PCMS-Commisoft personal ( lisensi personal : https://commipro.com/ )

Materi yang di bahas selama 8 Jam

1) Konsep Dasar Completion Management 

  • Definisi dan tujuan Project Completion Management System (PCMS)
  • Terminologi penting: MC, RFC, RFSU, RFS, Commissioning, Start-up, Handover
  • Struktur breakdown: Area → System → Subsystem → Tag/Equipment → Checklist
  • Peran & tanggung jawab: Construction, QA/QC, Commissioning, Client/Operator

2) Systemization & Boundary Management 

  • Cara membangun System/Sub-system list dari P&ID, SLD, Plot Plan, Isometric, Equipment list
  • Konsep boundary / battery limit dan interface (package vendor, tie-in)
  • Penentuan urutan handover: System priority & sequence logic
  • Template praktis: System Index / Subsystem register

3) Mechanical Completion Workflow & ITR Management 

  • Alur MC: Construction complete → QC verification → punch listing → clearance
  • Struktur ITR (Inspection & Test Record): checklist, test record, attachment, sign-off
  • Evidence management: as-built mark-up, material traceability, calibration, torque record, NDT summary (high level)
  • Status rule: Open/Closed, partial sign-off, revision control

Praktik: mapping 1 subsystem → daftar ITR wajib + evidence minimal.

4) Punch List Management 

  • Punch list category (umum): A / B / C dan arti “system ready”
  • Workflow: raise → validate → assign → rectify → verify → close
  • Punch list vs NCR vs site query (bedakan fungsi dan dampaknya)
  • Reporting: aging, outstanding by discipline/system, warranty punch list (high level)

Praktik: klasifikasi contoh temuan menjadi A/B/C + keputusan “boleh lanjut test atau tidak”.

5) Pre-commissioning & Commissioning Readiness 

  • Perbedaan Pre-commissioning vs Commissioning (scope dan deliverable)
  • Readiness gate: Ready for Pre-Comm / Ready for Commissioning / Ready for Start-up
  • Contoh aktivitas: flushing, leak test, loop check (overview), energization readiness, functional test
  • Keterkaitan punch list & ITR: “blocking items” untuk hydrotest/energization

Praktik: buat readiness checklist ringkas untuk 1 system (misal: hydrotest line / motor feeder).

6) System Handover, STP & Dossier 

  • Konsep System Handover / RFSU / Provisional Acceptance (level konsep)
  • Isi System Turnover Package (STP): index, ITR, punch status, test packs, certificates, as-built, vendor docs (struktur)
  • Handover certificate & interface dengan Operator
  • Handover tracking & close-out strategy

Praktik: susun outline STP/Dossier untuk 1 system (folder structure + index).

7) Progress Measurement & Completion Dashboard 

  • Progress rules: credit system (by ITR closed / by subsystem complete / weighted)
  • KPI umum: %MC by system, punch aging, readiness status, forecast handover
  • Contoh format reporting period (weekly/monthly) & filter by discipline/system

Mini output: peserta paham cara menghitung progress completion yang “audit-able”.

8) Simulation Workshop: End-to-End Scenario 

Studi kasus singkat: 1 system dari “construction finish” sampai “handover”

  • Tentukan subsystem, ITR list, punch handling, readiness, dan STP index
  • Diskusi kesalahan umum dan best practice di proyek
Kembali

Event Lainnya

Hubungi Kami